NOM !!!! IPO Keliber rykker nærmere :) NOM!!!
Det kan være bare dager igjen til det braker løs i NOM. De 18,5 % av Keliber. Finn frem pengene....
Redigert 21.01.2021 kl 09:31
Du må logge inn for å svare
Boss 99
30.04.2019 kl 12:54
6372
Var det ikke julenissen på kjerringa det het da?
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
30.04.2019 kl 13:45
6336
Fristende de som ligger tilsalgs på ,2,70 tallet og oppover gitt. Vi får se om jeg finner noe rusk liggende å slenge.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
jonic
30.04.2019 kl 17:40
6203
Statement by Vice-President Maroš Šefčovič on the third political meeting under the European Battery Alliance
http://europa.eu/rapid/press-release_STATEMENT-19-2337_en.htm
http://europa.eu/rapid/press-release_STATEMENT-19-2337_en.htm
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Tjuagutt
30.04.2019 kl 18:07
6172
We must also show that we mean business when filling the remaining gaps in the value chain, notably mining and refining. EU companies need to be better supported to invest in sustainable mining and refining of raw materials – both in EU and third countries. We plan to lauch a European Raw materials investment facility with the EBRD and the EIB) – hopefully at the end of the year.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Limetree
02.05.2019 kl 15:49
5936
Det kommer stadig oftere nyheter om europeisk samarbeid for aa produsere neste generasjon batterier:
Link: https://www.hegnar.no/Nyheter/Naeringsliv/2019/05/Europeisk-samarbeid-om-utvikling-av-bedre-elbil-batterier
Det nye prosjektet, som det skal investeres mellom 50 og 60 milliarder kroner i, ble kunngjort av Frankrikes finansminister Bruno Le Maire og Tysklands finansminister Peter Altmaier under en felles pressekonferanse torsdag.
– Andre medlemsland har alt vist interesse for å bli med på dette prosjektet, sa Le Maire, som trakk fram Italia, Belgia, Polen, Østerrike og Finland.
Rundt 40 milliarder kroner vil ifølge Le Maire komme fra private selskap, blant dem den franske bilprodusenten PSA og batteriprodusenten Saft, som er en del av den franske oljegiganten Total.
– Interessen i prosjektet er større enn noensinne, sa Altmaier, som opplyste at 35 bedrifter så langt har ytret ønske om å delta, blant dem Europas største bilprodusenter.
Om få måneder åpner en testfabrikk med rundt 200 ansatte i Frankrike, mens målet er å etablere to produksjonsanlegg med til sammen 1.500 ansatte i Frankrike og Tyskland. Europeiske ledere har lenge etterlyst et samarbeid for å utvikle neste generasjon batterier til elbiler, med henvisning til at bilprodusentene i dag i stor grad er prisgitt batterier produsert i Kina og andre asiatiske land.
Link: https://www.hegnar.no/Nyheter/Naeringsliv/2019/05/Europeisk-samarbeid-om-utvikling-av-bedre-elbil-batterier
Det nye prosjektet, som det skal investeres mellom 50 og 60 milliarder kroner i, ble kunngjort av Frankrikes finansminister Bruno Le Maire og Tysklands finansminister Peter Altmaier under en felles pressekonferanse torsdag.
– Andre medlemsland har alt vist interesse for å bli med på dette prosjektet, sa Le Maire, som trakk fram Italia, Belgia, Polen, Østerrike og Finland.
Rundt 40 milliarder kroner vil ifølge Le Maire komme fra private selskap, blant dem den franske bilprodusenten PSA og batteriprodusenten Saft, som er en del av den franske oljegiganten Total.
– Interessen i prosjektet er større enn noensinne, sa Altmaier, som opplyste at 35 bedrifter så langt har ytret ønske om å delta, blant dem Europas største bilprodusenter.
Om få måneder åpner en testfabrikk med rundt 200 ansatte i Frankrike, mens målet er å etablere to produksjonsanlegg med til sammen 1.500 ansatte i Frankrike og Tyskland. Europeiske ledere har lenge etterlyst et samarbeid for å utvikle neste generasjon batterier til elbiler, med henvisning til at bilprodusentene i dag i stor grad er prisgitt batterier produsert i Kina og andre asiatiske land.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Post
03.05.2019 kl 09:22
5758
Når er det planlagt oppstart av Engebø, noen som har litt informasjon om dette?
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
dr_noclue
03.05.2019 kl 09:50
5720
Kai Helkiö appointed as Keliber’s Construction Project Director
THU, MAY 02, 2019 13:00 CET
Kai Helkiö (Construction Manager) has been appointed as a Construction Project Director for Keliber Oy's Lithium Project. Helkiö will be responsible for organizing the construction project, selection of the key suppliers, schedule of the construction project and safety and environmental aspects of the project. Helkiö will start in his position in June 1st 2019 and will report to CEO Pertti Lamberg.
Helkiö has a long international experience from the construction project management. He has previously worked as a Project Director and Project Manager for example at Lemminkäinen, Lemcon Asia, LEC Networks, NCC Finland Oyj, Huawei Finland and Ed. Zueblin Ag (Germany). Helkiö will join Keliber as Construction Project Director from the position of Risk Manager at Assi hospital project of Skanska Oy Finland.
"I warmly welcome Kai to join the company. He has extensive experience from successful management of construction projects. I’m confident Kai will make a strong contribution to the company's lithium project," says Pertti Lamberg, CEO of Keliber Oy.
For further information:
Pertti Lamberg, CEO, Keliber Oy, tel. +358 50 599 1189
Keliber Oy
https://news.cision.com/keliber/r/kai-helkio-appointed-as-keliber-s-construction-project-director,c2801455
THU, MAY 02, 2019 13:00 CET
Kai Helkiö (Construction Manager) has been appointed as a Construction Project Director for Keliber Oy's Lithium Project. Helkiö will be responsible for organizing the construction project, selection of the key suppliers, schedule of the construction project and safety and environmental aspects of the project. Helkiö will start in his position in June 1st 2019 and will report to CEO Pertti Lamberg.
Helkiö has a long international experience from the construction project management. He has previously worked as a Project Director and Project Manager for example at Lemminkäinen, Lemcon Asia, LEC Networks, NCC Finland Oyj, Huawei Finland and Ed. Zueblin Ag (Germany). Helkiö will join Keliber as Construction Project Director from the position of Risk Manager at Assi hospital project of Skanska Oy Finland.
"I warmly welcome Kai to join the company. He has extensive experience from successful management of construction projects. I’m confident Kai will make a strong contribution to the company's lithium project," says Pertti Lamberg, CEO of Keliber Oy.
For further information:
Pertti Lamberg, CEO, Keliber Oy, tel. +358 50 599 1189
Keliber Oy
https://news.cision.com/keliber/r/kai-helkio-appointed-as-keliber-s-construction-project-director,c2801455
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
vestavind
03.05.2019 kl 09:57
5703
Det går sakte fremover mens kursen går nedover. Selskapet er helt hjelpesløst på markedsføring.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Post
03.05.2019 kl 21:39
5453
Jeg er interessert i å selge mine aksjer i AXA for å kjøpe i NOM. Jeg har fått meget gode råd av en som har god peiling. Han kaller seg SS og tjener mye peng på børs.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
John9
03.05.2019 kl 23:53
5406
Du kan begynne med den her:
https://d2zbxcnktjvvs5.cloudfront.net/1552314543/isf-190308-pdac-investor-presentation.pdf
https://d2zbxcnktjvvs5.cloudfront.net/1552314543/isf-190308-pdac-investor-presentation.pdf
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
07.05.2019 kl 09:56
9372
Ja kor det går . Ser ut for at vi ligger i hengemyra å ikke kommer hverken nordover eller det som verre er. Fyttikatta.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
09.05.2019 kl 10:41
9128
Synd dette snart emi kurs igjen.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
vestavind
09.05.2019 kl 11:11
9095
nei ikke mye blest rundt dette selskapet. Er vel den vanlige emisjonen alle venter på.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
09.05.2019 kl 12:34
9013
den blir vel på 1,50 tenker jeg. Det blir jo direkte tåpelig å selg seg ut nå . Nå når gull egga kommer på løpende bånd. NEi for å være helt ærlig tror jeg ikke på emi og menneskeskapt klima endringer.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
fryktløs
09.05.2019 kl 16:13
8866
Da er vi snart på Emisjonskursen igjen. Er det noen som vet noe andre ikke vet siden vedkommende har så hast med å kvitte seg med aksjene?
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
09.05.2019 kl 19:24
8755
Det er alltid noen som vet hva som skjer. Både slik og slik. Vet bare at jeg er noe inni helvete lei hele jævla greia.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
vestavind
09.05.2019 kl 20:15
8737
Stor tabbe å investere her ja. Berre utsettingar og emisjoner.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
10.05.2019 kl 08:19
8601
Enclosed please find Nordic Mining's interim report and company presentation for
the first quarter of 2019. The interim report and company updates will be
presented today, Friday 10 May 2019 at 10.00 (CET) in the company's office
(address details below). A presentation and Q&A session will be held in English
and transferred via webcast (details for the webcast below).
Important events in the first quarter of 2019 and year-to-date:
NM Q1 2019
Presentation (https://mb.cision.com/Public/1583/2809502/bed40c2d672ad69b.pdf)Opt
i
mizing the business case for Keliber lithium Keliber's definitive feasibility
study ("DFS"), which was published in June 2018, confirmed a profitable business
case based on production of lithium carbonate. Following an increasing market
pull for lithium hydroxide for use in cathodes for lithium-ion batteries in
electric vehicles, Keliber has successfully completed a test program for
production of lithium hydroxide which significantly improves project economics.
Keliber published an updated executive summary of the DFS in April 2019
outlining an increase in post-tax NPV@8% by more than 70% to EUR 384 million and
IRR of 24%.
Gain of NOK 98m reflecting increased values in Keliber In February 2019,
Keliber raised EUR 10 million from existing shareholders to finance ongoing
development work and other pre-construction activities. The implied value in the
capital raise exceeded the book value recorded by Nordic Mining by NOK 98
million which is recognized as a gain in the consolidated financial statements
for Q1 2019. The gain is not subject to tax. Following the share issue, Nordic
Mining's shareholding in Keliber is approximately 18.5%.
Definitive feasibility activities progressing well All major test work has been
completed and the flow sheet is optimized with respect to the dual product
combination. Full scale waterjet cutting testing using garnet products from
Engebø indicate performance according to expectations for premium quality garnet
products for cutting speed, finish as well as for abrasive consumption.
Agreement with Japanese trading house on offtake and construction financing In
January 2019, Nordic Mining signed a Heads of Agreement with a reputable
Japanese trading house relating to long term offtake for rutile and
participation with a substantial portion of the construction financing for the
Engebø project. The offtake on rutile is complementary to the Heads of Agreement
previously entered into with the Barton Group relating to offtake and commercial
cooperation for garnet from Engebø. Nordic Mining is in constructive dialogue
with both parties and the agreements will be further developed over the next
months to secure future cashflows and strengthen the ability to provide
financing for the project.
Engagement of financial advisor for the Engebø construction financing In January
2019, Nordic Mining entered into an agreement with Northcott Capital Ltd for
provision of financial advisory services for the debt financing of the Engebø
project.
Application for operating license filed In February 2019, Nordic Mining filed an
application for operating licence for the Engebø project with the Norwegian
Directorate of Mining. Approval is expected within 12 months. The operating
license will regulate operational scope, methodology and procedures to secure
safe and efficient production of the mineral resources. The zoning plan for the
mining and processing areas and the environmental permit for the project have
already been granted.
The first quarter presentation will be held today, Friday 10 May 2019 at 10:00
(CET) in Nordic Mining's office at Vika Atrium, Munkedamsveien 45 (Entrance A,
5th floor), N-0250 Oslo.
The presentation and Q&A session will be held in English and transferred via
webcast. You will have the opportunity to post questions online throughout the
webcast session. The webcast will be available on:
https://webtv.hegnar.no/presentation.php?webcastId=97815752 and at
www.nordicmining.com.
the first quarter of 2019. The interim report and company updates will be
presented today, Friday 10 May 2019 at 10.00 (CET) in the company's office
(address details below). A presentation and Q&A session will be held in English
and transferred via webcast (details for the webcast below).
Important events in the first quarter of 2019 and year-to-date:
NM Q1 2019
Presentation (https://mb.cision.com/Public/1583/2809502/bed40c2d672ad69b.pdf)Opt
i
mizing the business case for Keliber lithium Keliber's definitive feasibility
study ("DFS"), which was published in June 2018, confirmed a profitable business
case based on production of lithium carbonate. Following an increasing market
pull for lithium hydroxide for use in cathodes for lithium-ion batteries in
electric vehicles, Keliber has successfully completed a test program for
production of lithium hydroxide which significantly improves project economics.
Keliber published an updated executive summary of the DFS in April 2019
outlining an increase in post-tax NPV@8% by more than 70% to EUR 384 million and
IRR of 24%.
Gain of NOK 98m reflecting increased values in Keliber In February 2019,
Keliber raised EUR 10 million from existing shareholders to finance ongoing
development work and other pre-construction activities. The implied value in the
capital raise exceeded the book value recorded by Nordic Mining by NOK 98
million which is recognized as a gain in the consolidated financial statements
for Q1 2019. The gain is not subject to tax. Following the share issue, Nordic
Mining's shareholding in Keliber is approximately 18.5%.
Definitive feasibility activities progressing well All major test work has been
completed and the flow sheet is optimized with respect to the dual product
combination. Full scale waterjet cutting testing using garnet products from
Engebø indicate performance according to expectations for premium quality garnet
products for cutting speed, finish as well as for abrasive consumption.
Agreement with Japanese trading house on offtake and construction financing In
January 2019, Nordic Mining signed a Heads of Agreement with a reputable
Japanese trading house relating to long term offtake for rutile and
participation with a substantial portion of the construction financing for the
Engebø project. The offtake on rutile is complementary to the Heads of Agreement
previously entered into with the Barton Group relating to offtake and commercial
cooperation for garnet from Engebø. Nordic Mining is in constructive dialogue
with both parties and the agreements will be further developed over the next
months to secure future cashflows and strengthen the ability to provide
financing for the project.
Engagement of financial advisor for the Engebø construction financing In January
2019, Nordic Mining entered into an agreement with Northcott Capital Ltd for
provision of financial advisory services for the debt financing of the Engebø
project.
Application for operating license filed In February 2019, Nordic Mining filed an
application for operating licence for the Engebø project with the Norwegian
Directorate of Mining. Approval is expected within 12 months. The operating
license will regulate operational scope, methodology and procedures to secure
safe and efficient production of the mineral resources. The zoning plan for the
mining and processing areas and the environmental permit for the project have
already been granted.
The first quarter presentation will be held today, Friday 10 May 2019 at 10:00
(CET) in Nordic Mining's office at Vika Atrium, Munkedamsveien 45 (Entrance A,
5th floor), N-0250 Oslo.
The presentation and Q&A session will be held in English and transferred via
webcast. You will have the opportunity to post questions online throughout the
webcast session. The webcast will be available on:
https://webtv.hegnar.no/presentation.php?webcastId=97815752 and at
www.nordicmining.com.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
vestavind
10.05.2019 kl 08:21
8612
Samme kjedelige meldingene med oppramsing av ting vi vet, aldri noe som kan få kursen opp.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
fryktløs
11.05.2019 kl 12:12
8343
Du verden for en flott artikkel i dagens Finansavisen(Lørdagsutgaven) Helside om Nordic Mening:=)
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
11.05.2019 kl 14:24
8285
Det e bra. Håper det er en øye åpner til resten av befolkningen. De med penger altså det.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
13.05.2019 kl 09:35
8110
1,90 neppe.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
14.05.2019 kl 10:13
7875
Så stille så stile. Så stille som det er nå det har det vel ikke vert før her på Hegnar. Har alle gitt opp eller hva skjer. Strup eller hva det nå var har snublet og falt og brukket alle fingrene hørt jeg . I hvert fall stille fra den kanten. Blir vel liv når alle guttene skal inn daaaaa.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
dr_noclue
14.05.2019 kl 11:02
7830
Det i tider som dette det er greit å ha en jobb man kan vende fokus mot og bare vente ut denne ørkenvandringen... Forhåpentligvis er det en oase i det fjerne og ikke bare en vannspeiling...
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
DrHayek
14.05.2019 kl 11:28
7832
https://www.ft.com/content/872bcfce-7279-11e9-bbfb-5c68069fbd15
https://www.ft.com/content/88d8b580-75b2-11e9-bbad-7c18c0ea0201
https://www.ft.com/content/88d8b580-75b2-11e9-bbad-7c18c0ea0201
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
16.05.2019 kl 09:53
7626
Stille stund. Skulle det være noe i veien for at denne aksje ikke skulle begynne å rusle (les små løpe) nordover nå?
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
John9
16.05.2019 kl 12:18
7532
Nei. No bør alt ligge til rette for det. Folkemøtet i Vevring i går, og folkemøtet med Dirmin, miljøverndirektoratet og NGU den 17.juni ser eg som eit ledd i NOM og Naustdal kommune sin strategi for å opplyse motstandardar av gruvedrift om at det er ein faktisk realitet, det skal byggast gruve.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
vestavind
16.05.2019 kl 12:30
7515
Gruve blir det, men er vel som vanlig emisjonsspøkelset som held den igjen
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
John9
16.05.2019 kl 12:41
7494
Om folk er bekymra for emisjonar bør dei kanskje heller sette pengane i banken. Litt av poenget med å være børsnotert er vel å ha mulighet til å hente inn kapital. Ein emisjon mot aksjonærane er kun ein fordel, og det blir musepiss ift utbyggingsinvesteringa på 207 m$.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
_HH_
16.05.2019 kl 13:51
7442
Ja det er eit musepiss, men det kan no hende usikkerheita knytt til den endelege finansieringspakka byrjar å gjere seg gjeldande også sidan det er uklart korleis NOM skal sette saman egenkapitalen i denne pakken. Tipper ein god del blir dekka av offtake.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
16.05.2019 kl 14:05
7423
Store greier på vei inn.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
16.05.2019 kl 14:11
7430
Eller ut, ble litt usikker der.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
16.05.2019 kl 14:15
7389
Ser ut for at livet er fult av usikkerhet. Spesielt i denne aksje her.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Tjuagutt
16.05.2019 kl 15:02
7129
Kan noe av handelen vi ser i NOM utføres av person(er) som har forskjellig kont?. På den måten kan han/de manipulere kursen opp/ned. Er i utgangspunktet ulovlig, men når brydde OSE seg om det....
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Sailor
16.05.2019 kl 15:15
7133
Gamle tanter og grandtanter har blitt brukt for å ta innersvingen på børsen før ...
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
John9
16.05.2019 kl 21:33
6978
Ja, det ser jo slik ut, og det vart frå Nakken si side sagt på møtet i går at dei arbeidde i stor grad med å offtakeavtalane, men det er og slik at DFS er eit vesentlig dokument å ha klart før ein gjer ein endelig avtale.
Med dei oppjusteringane som kan komme der er det ganske viktig å ha dette på bordet før ein forhandlar endeleg pris.
Med dei oppjusteringane som kan komme der er det ganske viktig å ha dette på bordet før ein forhandlar endeleg pris.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
21.05.2019 kl 12:15
6636
NRKs avsløring av Mattilsynets manipulerende rapportering fra inspeksjonen ved en pelsdyrfarm i Sandnes, er et nytt eksempel på hvordan korrupsjonen brer seg i offentlig sektor – og en illustrasjon på at lite gjøres med det.
Pelsdyrmotstandere i mattilsynet. Uten å dra noen særlig spekulasjoner aner jeg en likhet med Naturvernere og NOM. Hvor er det blitt av ærlighet og redelighet.Jeg bare spørr.
Pelsdyrmotstandere i mattilsynet. Uten å dra noen særlig spekulasjoner aner jeg en likhet med Naturvernere og NOM. Hvor er det blitt av ærlighet og redelighet.Jeg bare spørr.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
23.05.2019 kl 12:13
6336
Forholdstall bud/tilbud: 1.75
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare
Boss 99
24.05.2019 kl 09:52
6175
Hvem start oppturen? Det er i dag den skal starte, ikke? Jævla lite til salgs.
Redigert 21.01.2021 kl 06:03
Du må logge inn for å svare