Aker Offshore Wind - Trigger liste
Er det noen som har noe å legge til her, gi beskjed
Aker Offshore Wind (AOW) AKH har 51% eierskap - 1.5 GW portfolio of development projects
- Emisjon til drift, hvis de ikke får en kontrakt de kan kjøre emisjon på snart
- Lisensrunden i Skottland - Linsens ventet å bli tildelt H1 2022 - Scotwind (new submission deadline in Mid-July - søknadsfristen 16. juli) - aims to provide 10 GW in new installed capacity - aims to develop more than 500 MW in gross capacity. Lease award is expected H1 2021, FID in 2028 and commercial operation date in 2030.
https://www-energyvoice-com.cdn.ampproject.org/c/s/www.energyvoice.com/renewables-energy-transition/wind/337342/ocean-winds-scotwind/amp/
«Røkke-selskapet er sammen med Mainstream Renewable Power valgt som foretrukket budgiver for å kjøpe en initiell 50 prosent andel av et flytende havvindprosjekt i Japan»
https://e24.no/boers-og-finans/i/5G3Wjb/aker-offshore-wind-favoritt-til-havvindprosjekt-i-japan
- Korea - Sites allocated. Electricity business license. H2 2021
- Ocean Winds and Aker Offshore Wind Announce Partnership for Floating Offshore Wind Energy in Scotland
- Lisensrunden i California juni 2022 (New bill would set state target to build hundreds of tall turbines in the Pacific Ocean by 2030). Lease auction Q2/Q3 2022.
- AOW owns a share of the project development company KF Wind, The project has a total potential capacity of 1,500 MW with electricity production from first phase of 500 MW from 2025-2026
- AOW announced establishment of a 50/50 JV with Swedish company Hexicon to explore floating wind opportunities in Sweden. Sweden has ambitious renewables ambitions and may become a large floating offshore wind market. Public consultation for 3 areas. Seabed survey permits submitted for 3 sites.
https://www.hexicon.eu/projects/
Vindkraftsparken Dyning
https://www.hexicon.eu/wp-content/uploads/2021/06/Dyning.pdf
Vindkraftsparken Mareld
https://www.hexicon.eu/wp-content/uploads/2021/06/Mareld.pdf
Vindkraftsparken Kultje
https://www.hexicon.eu/wp-content/uploads/2021/06/Kultje.pdf
--------------
- The Redwood Coast Offshore Wind Project (RedCOW) was established in 2018 as a consortium with Aker Solutions and EDP Renewables (now Ocean Winds)
Project has the potential to be a flagship project for the state, with an initial capacity of 150 MW by 2025. FID is scheduled for 2024, while the commercial operation date is expected in 2025
- AOW og Aker Horizons har signert en samarbeidsavtale med Statkraft, Europas største produsent av fornybar energi, fornybarprodusent, for å utforske muligheter for havvind på norsk kontinentalsokkel.
- The Norwegian government has opened two areas for offshore wind development with a potential capacity of about 4.5 GW: Sørlige Nordsjø II and Utsira Nord. Forventet at lisenser blir tildelt H1 2022.
- Børs meldt 14.6.2021: The partnership - in which bp, Statkraft and Aker Offshore Wind will each hold a 33.3% share - will pursue a bid to develop offshore wind power in the Sørlige Nordsjø II (SN2) licence area
«Under talen fortalte Tina Bru at det vil bli gitt konsesjoner til to eller tre aktører i Sørlige Nordsjø II, som skal velges ut etter en kvalifiseringsrunde og en auksjon.
Bru har som mål at auksjonene skal annonseres første kvartal i 2022»
«I Utsira Nord, der det skal bygges flytende havvind, vil det åpnes for tre utbygginger på opp til 500 megawatt hver»
https://e24.no/det-groenne-skiftet/i/OQwbxE/vil-aapne-flere-omraader-for-havvind
- Project Sønnavindar is located in Sørlige Nordsjø II - opened for license applications starting January 2021 - Pending development of the government framework,
FID is expected in 2024 - phased development between 2026 and 2029. AOW target to develop 1,200 MW. AOW currently takes an architect role for the total development concepts, including electrification infrastructure, and may set up separate structures for scope outside of the wind farm itself
- Project Vestavindar is located in Utsira Nord - Pending development of the government framework, FID is expected in 2024 and commercial operation date is expected in 2026 - AOW targets to develop 500 MW of gross installed capacity. AOW currently takes an architect role for the total development concepts, including electrification infrastructure, and may set up separate structures for scope outside of the wind farm itself
Principle Power (ikke børs notert) 47% eierskap - Aker, via subsidiary Vestavindar Offshore Wind, funded by Aker Offshore Wind's
- børsnotering av Principle Power
- konsesjoner i Norge (denne sommeren?),
- Samarbeid med Statskraft og svenskene.
- More than 100 MW installed capacity by 2022
- World’s first 8.4 MW floating turbine installed offshore in Portugal
https://www.principlepowerinc.com/
Info fra prospekt til Aker Horizons når selskapet flyttes til hovedindeksen 21.5.2021:
https://static1.squarespace.com/static/5f871df7bb429b52ac77d186/t/60a632df064ee75be0ce520d/1621504756046/Aker+Horizons+Prospectus.pdf
Aker Offshore Wind kan handles på USA børsen:
https://www.otcmarkets.com/stock/AKOWF/quote
Aker Offshore Wind (AOW) AKH har 51% eierskap - 1.5 GW portfolio of development projects
- Emisjon til drift, hvis de ikke får en kontrakt de kan kjøre emisjon på snart
- Lisensrunden i Skottland - Linsens ventet å bli tildelt H1 2022 - Scotwind (new submission deadline in Mid-July - søknadsfristen 16. juli) - aims to provide 10 GW in new installed capacity - aims to develop more than 500 MW in gross capacity. Lease award is expected H1 2021, FID in 2028 and commercial operation date in 2030.
https://www-energyvoice-com.cdn.ampproject.org/c/s/www.energyvoice.com/renewables-energy-transition/wind/337342/ocean-winds-scotwind/amp/
«Røkke-selskapet er sammen med Mainstream Renewable Power valgt som foretrukket budgiver for å kjøpe en initiell 50 prosent andel av et flytende havvindprosjekt i Japan»
https://e24.no/boers-og-finans/i/5G3Wjb/aker-offshore-wind-favoritt-til-havvindprosjekt-i-japan
- Korea - Sites allocated. Electricity business license. H2 2021
- Ocean Winds and Aker Offshore Wind Announce Partnership for Floating Offshore Wind Energy in Scotland
- Lisensrunden i California juni 2022 (New bill would set state target to build hundreds of tall turbines in the Pacific Ocean by 2030). Lease auction Q2/Q3 2022.
- AOW owns a share of the project development company KF Wind, The project has a total potential capacity of 1,500 MW with electricity production from first phase of 500 MW from 2025-2026
- AOW announced establishment of a 50/50 JV with Swedish company Hexicon to explore floating wind opportunities in Sweden. Sweden has ambitious renewables ambitions and may become a large floating offshore wind market. Public consultation for 3 areas. Seabed survey permits submitted for 3 sites.
https://www.hexicon.eu/projects/
Vindkraftsparken Dyning
https://www.hexicon.eu/wp-content/uploads/2021/06/Dyning.pdf
Vindkraftsparken Mareld
https://www.hexicon.eu/wp-content/uploads/2021/06/Mareld.pdf
Vindkraftsparken Kultje
https://www.hexicon.eu/wp-content/uploads/2021/06/Kultje.pdf
--------------
- The Redwood Coast Offshore Wind Project (RedCOW) was established in 2018 as a consortium with Aker Solutions and EDP Renewables (now Ocean Winds)
Project has the potential to be a flagship project for the state, with an initial capacity of 150 MW by 2025. FID is scheduled for 2024, while the commercial operation date is expected in 2025
- AOW og Aker Horizons har signert en samarbeidsavtale med Statkraft, Europas største produsent av fornybar energi, fornybarprodusent, for å utforske muligheter for havvind på norsk kontinentalsokkel.
- The Norwegian government has opened two areas for offshore wind development with a potential capacity of about 4.5 GW: Sørlige Nordsjø II and Utsira Nord. Forventet at lisenser blir tildelt H1 2022.
- Børs meldt 14.6.2021: The partnership - in which bp, Statkraft and Aker Offshore Wind will each hold a 33.3% share - will pursue a bid to develop offshore wind power in the Sørlige Nordsjø II (SN2) licence area
«Under talen fortalte Tina Bru at det vil bli gitt konsesjoner til to eller tre aktører i Sørlige Nordsjø II, som skal velges ut etter en kvalifiseringsrunde og en auksjon.
Bru har som mål at auksjonene skal annonseres første kvartal i 2022»
«I Utsira Nord, der det skal bygges flytende havvind, vil det åpnes for tre utbygginger på opp til 500 megawatt hver»
https://e24.no/det-groenne-skiftet/i/OQwbxE/vil-aapne-flere-omraader-for-havvind
- Project Sønnavindar is located in Sørlige Nordsjø II - opened for license applications starting January 2021 - Pending development of the government framework,
FID is expected in 2024 - phased development between 2026 and 2029. AOW target to develop 1,200 MW. AOW currently takes an architect role for the total development concepts, including electrification infrastructure, and may set up separate structures for scope outside of the wind farm itself
- Project Vestavindar is located in Utsira Nord - Pending development of the government framework, FID is expected in 2024 and commercial operation date is expected in 2026 - AOW targets to develop 500 MW of gross installed capacity. AOW currently takes an architect role for the total development concepts, including electrification infrastructure, and may set up separate structures for scope outside of the wind farm itself
Principle Power (ikke børs notert) 47% eierskap - Aker, via subsidiary Vestavindar Offshore Wind, funded by Aker Offshore Wind's
- børsnotering av Principle Power
- konsesjoner i Norge (denne sommeren?),
- Samarbeid med Statskraft og svenskene.
- More than 100 MW installed capacity by 2022
- World’s first 8.4 MW floating turbine installed offshore in Portugal
https://www.principlepowerinc.com/
Info fra prospekt til Aker Horizons når selskapet flyttes til hovedindeksen 21.5.2021:
https://static1.squarespace.com/static/5f871df7bb429b52ac77d186/t/60a632df064ee75be0ce520d/1621504756046/Aker+Horizons+Prospectus.pdf
Aker Offshore Wind kan handles på USA børsen:
https://www.otcmarkets.com/stock/AKOWF/quote
Redigert 17.12.2021 kl 10:38
Du må logge inn for å svare
Patron72
15.12.2021 kl 12:04
2968
Hehe
Du kjøpte din første aksjer i dag og savner allerede triggere?
Med de prosjektene Aow er innvolvert i pr idag vet vi jo sånn ca når en kan forvente konklusjon.
Du kjøpte din første aksjer i dag og savner allerede triggere?
Med de prosjektene Aow er innvolvert i pr idag vet vi jo sånn ca når en kan forvente konklusjon.
trani
15.12.2021 kl 15:14
2693
Bør vel komme en melding til i morgen, som løfter denne over kr.5 for godt.
Hva har folk for kursmål for AOW for 2022?
Hva har folk for kursmål for AOW for 2022?
4580
15.12.2021 kl 15:29
2931
vanskelig å spå, men med full klaff med kontrakter, 20 - 30. Kanskje tar det 2 år. ( ref.div.analytikere)
4580
15.12.2021 kl 15:37
2901
Må si jeg er veldig imponert hvordan massiv shorting kan legge en slik klam hånd på en aksje. Direkte imponerende.
Frodon
17.12.2021 kl 07:09
2418
«Ocean Winds and Aker Offshore Wind Announce £235 Million Supply Chain Investment Package for Scotland»
https://newsweb.oslobors.no/message/549702
https://newsweb.oslobors.no/message/549702
Frodon
17.12.2021 kl 07:43
2227
Det skal jo hentes kapital på nivå mange ganger høyere enn mcap hvis de får anbudet. Er det ikke like greit å kjøpe seg inn via en av emisjonene?
Sickip
17.12.2021 kl 07:44
2218
AOW er presset ned på pris. I går gikk TRVX i porteføljen. I dag skal AOW gå hardt. Gratulerer til alle ombord!!! Wicuuu!!
4300dk
17.12.2021 kl 07:50
2168
Måske en drøm kan gå i opfyldelse 👍🚀😍 https://www.shelby.com/Vehicles/Shelby-GT500-KR
Frodon
17.12.2021 kl 07:57
2120
retur skrev Er du ikke inne i aow enda Frode?
Jeg har ikke hatt aksjer i AOW siden jeg solgte aksjene jeg kjøpte de første børsdagene + gratis aksjene. Jeg synes AOW er veldig dyr i forhold til Mainstream. Solgte også mye av aksjene i AKH på kr 35, som du kanskje vet 😉 Har fortsatt alle aksjene i Aker, som ble kjøpt på kr 292.
Hvordan tenker du at AOW skal finansiere ca 15 milliarder pund med sin partner? Blir kanskje en kombo av lån og emisjon på forskjellige tidspunkt?
https://aksjelive.e24.no/article/Kze8X5
Hvorfor tenker dere at AOW skal opp på dagens melding? Mainstream, som AKH eier 75% av, lanserte en slik pakke for lenge siden. Kan ikke huske at AKH aksjen gikk opp på den nyheten?
Hvordan tenker du at AOW skal finansiere ca 15 milliarder pund med sin partner? Blir kanskje en kombo av lån og emisjon på forskjellige tidspunkt?
https://aksjelive.e24.no/article/Kze8X5
Hvorfor tenker dere at AOW skal opp på dagens melding? Mainstream, som AKH eier 75% av, lanserte en slik pakke for lenge siden. Kan ikke huske at AKH aksjen gikk opp på den nyheten?
Redigert 17.12.2021 kl 07:59
Du må logge inn for å svare
tod-l
17.12.2021 kl 08:01
2092
Enova pressekonferanse YouTube. https://www.youtube.com/watch?v=QyD-pU2J_ME
R1234
17.12.2021 kl 08:04
2059
Enig Frode, men det bygger fundament og som kurs, verdi AOW nå, skal det lite til før den spretter oppover.
Tradinator
17.12.2021 kl 08:15
1959
Enormt prosjekt. Det ser bra ut mtp på Skotland. Ser ut som Aker har godt renommé der fra før og profiterer på denne. Nå er det svært nærme big things.
4580
17.12.2021 kl 08:18
1930
God morgen. Det begynner å "rør" på seg i Aow nå. Tenker gutta i Bosten har det hektisk nå. Er litt spent på dagens forløp.
Frodon
17.12.2021 kl 08:19
1919
Det er jeg absolutt enig i 😊 Jeg savner at AOW får tilslag på flere anbud. Hvorfor får de ikke kontrakter? Synes du AOW er billig i forhold til eks Mainstream, som Aker Horizons eier 75% av?
Se prosjektene Mainstream bygger opp nå:
https://finansavisen.no/forum/thread/140078/view/3796262
Se prosjektene Mainstream bygger opp nå:
https://finansavisen.no/forum/thread/140078/view/3796262
tod-l
17.12.2021 kl 08:29
1841
ja synes de er billige og ang. tilslag på kontrakter så er jo de under behandling. Første ut er kanskje japan ? Scotwind er annonsert på nyåret Korea kommer vel ut på nyåret engang også . Skjønner ikke hvorfor kan mene det at de sliter med kontrakter, med mindre du er short da ?
Patron72
17.12.2021 kl 08:34
1803
Hvorfor de ikke får flere kontrakter er jo enkelt svart at tildelingene ikke har startet enda.
Når det gjelder japan står det igjen bare å bli enige med progression energy. Da er det vel pris de diskuterer nå?
Når det gjelder japan står det igjen bare å bli enige med progression energy. Da er det vel pris de diskuterer nå?
tod-l
17.12.2021 kl 08:51
1626
og en liten tillegsinfo så er ikke Korea på anbud, men Due diligence.....
10PS
17.12.2021 kl 09:09
1515
Ocean Winds og Aker Offshore Wind går inn med 235 millioner pund i tidlige investeringer for å gjøre Skottland til et grønt, industrielt maktsenter, går det frem av en børsmelding.
«Ved å skape «first mover advantage» tror Aker Offshore Wind at Skottland kan bli et av de første landene i verden som lanserer flytende havvind i en industriell skala», heter det.
Som del av et konsortium har Aker Offshore Wind levert inn søknader for opptil tre anlegg i up Outer Moray Firth med muligheter for å generere i alt 6GW vindkraft som en del av ScotWind- programmet, og tilknyttede totalinvesteringer på opptil 15 milliarder pund for alle de tre anleggene.
Hver søknad estimeres å generere over 5.000 jobber og 200 lærlingeplasser i Skottland på tvers av alle prosjektfaser. Konsortiet varsler videre omfattende investeringer i skotske havner, så vel som ny subsea-teknologi.
Over 30 intensjonsavtaler ligger inne på tvers av tilbudskjeden for å støtte budene og «de tidlige grepene som trengs.»
«Ved å skape «first mover advantage» tror Aker Offshore Wind at Skottland kan bli et av de første landene i verden som lanserer flytende havvind i en industriell skala», heter det.
Som del av et konsortium har Aker Offshore Wind levert inn søknader for opptil tre anlegg i up Outer Moray Firth med muligheter for å generere i alt 6GW vindkraft som en del av ScotWind- programmet, og tilknyttede totalinvesteringer på opptil 15 milliarder pund for alle de tre anleggene.
Hver søknad estimeres å generere over 5.000 jobber og 200 lærlingeplasser i Skottland på tvers av alle prosjektfaser. Konsortiet varsler videre omfattende investeringer i skotske havner, så vel som ny subsea-teknologi.
Over 30 intensjonsavtaler ligger inne på tvers av tilbudskjeden for å støtte budene og «de tidlige grepene som trengs.»
Frodon
17.12.2021 kl 10:08
1322
Short nei, hvorfor skulle jeg være det? Så du på linken over prosjekter Mainstream holder på å bygge ut?
TraderMom
17.12.2021 kl 10:10
1311
He he ja, vanskelig selv for AOW å få kontrakter før tildeling har startet. Med slike forventninger, så vil man slite med humøret i aksjemarkedet :-D
Det lukter fugl av Skottlandsplanene, spesielt etter dagens børsmelding. Ingenting er avgjort naturligvis, men avklaring kommer relativt snart og jeg personlig blir overrasket om AOW ikke får tildeling.
Det lukter fugl av Skottlandsplanene, spesielt etter dagens børsmelding. Ingenting er avgjort naturligvis, men avklaring kommer relativt snart og jeg personlig blir overrasket om AOW ikke får tildeling.
Frodon
17.12.2021 kl 10:10
1307
Har ikke tildelingen av prosjekter begynt enda? Det er masse prosjekter som er tildelt og utbygd. Mener du at de prosjektene som AOW har sendt børs melding om, ikke er tildelt?
Frodon
17.12.2021 kl 10:13
1275
Kan ikke du noe om dette heller?
Er det ingen her med kunnskap om havvind?
Er det ingen her med kunnskap om havvind?
tod-l
17.12.2021 kl 10:19
1243
De prospektene som AOW jobber med er Japan, USA, Scotland, Norge, sør-Korea og Sverige...
så kan du være så vennlig fortelle hvilke av disse som er gitt til andre aktører?
så kan du være så vennlig fortelle hvilke av disse som er gitt til andre aktører?